Delays in Construction Projects: Causes, Effects and Remedies

QS Prof. Reuben A. Okereke, Aribana Kelechi Chukwuemeka

Abstract

Construction delays threaten cost certainty, quality, contractual relationships and infrastructure delivery in Nigeria. This study examined the principal causes and effects of construction delays and assessed the remedies used by project stakeholders. A convergent mixed-method design was adopted. Structured questionnaires were distributed to 120 clients, contractors and consultants in Lagos, Abuja, Port Harcourt and Kano; 102 valid responses were returned, representing an 85 per cent response rate. Semi-structured interviews with 15 professionals supplemented the survey. Questionnaire data were analysed with frequencies, percentages and the Relative Importance Index, while interview evidence was organised thematically. Delayed client payments ranked first among the causes of delay (RII = 0.91), followed by poor project planning and scheduling (RII = 0.87), shortage of skilled labour (RII = 0.82), design errors and late revisions (RII = 0.81), and inadequate communication (RII = 0.79). Cost overrun was the most frequently reported effect (90.2 per cent), followed by project abandonment (72.5 per cent) and disputes or litigation (64.7 per cent). Regular progress meetings were the most widely adopted remedy (70.6 per cent), while formal dispute-resolution mechanisms were least reported (42.2 per cent). The findings show that delays arise from interacting financial, managerial, technical and institutional weaknesses. The study recommends enforceable payment schedules, coordinated design review, critical-path monitoring, staged adoption of digital project controls, workforce development and time-bound regulatory approvals. It concludes that sustainable improvement requires shared accountability among clients, contractors, consultants and public regulators.

References

Aibinu, A. A., & Jagboro, G. O. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593– 599. https://doi.org/10.1016/S0263-7863(02)00028-5 Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010 Creswell, J. W., & Plano Clark, V. L. (2018). Designing and conducting mixed methods research (3rd ed.). SAGE. Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479– 489. https://doi.org/10.1016/j.ijproman.2011.10.004 Egwim, C. N., Alaka, H., Toriola-Coker, L. O., Balogun, H., Ajayi, S., & Oseghale, R. (2023). Extraction of underlying factors causing construction projects delay in Nigeria. Journal of Engineering, Design and Technology, 21(5), 1323–1342. https://doi.org/10.1108/JEDT- 04-2021-0211 Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing country: Ghana as a case study. International Journal of Project Management, 21(5), 321–326. https://doi.org/10.1016/S0263-7863(02)00055-8 Mansfield, N. R., Ugwu, O. O., & Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12(4), 254–260. https://doi.org/10.1016/0263-7863(94)90050-7 National Bureau of Statistics. (2026). Nigerian gross domestic product report Q1 2026. https://www.nigerianstat.gov.ng/ Nnadi, E. O. E., & Najjobyo, J. (2025). Financial and operational effects of cost estimation inaccuracy, material price volatility, and payment delays in Nigerian construction projects. Smart Construction and Sustainable Cities, 3, Article 29. https://doi.org/10.1007/s44268- 025-00076-4 Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management, 20(1), 67–73. https://doi.org/10.1016/S0263-7863(00)00037-5 Olanrewaju, O. I., Chileshe, N., Babarinde, S. A., & Sandanayake, M. (2020). Investigating the barriers to building information modeling implementation within the Nigerian construction industry. Engineering, Construction and Architectural Management, 27(10), 2931–2958. https://doi.org/10.1108/ECAM-01-2020-0042 Saka, A. B., & Chan, D. W. M. (2020). Profound barriers to building information modelling adoption in construction small and medium-sized enterprises: An interpretive structural modelling approach. Construction Innovation, 20(2), 261–284. https://doi.org/10.1108/CI- 09-2019-0087 Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007 IJGEM IJGEM IIARD International Journal of Geography & Environmental Management Toor, S.-U.-R., & Ogunlana, S. O. (2008). Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), 395–408. https://doi.org/10.1080/01446190801905406

More Articles from INTERNATIONAL JOURNAL OF SOCIAL SCIENCES AND MANAGEMENT RESEARCH

Governance Quality and Capital Inflows in Selected Economic Community of West African States (Ecowas)

Author: Ekere, Edobot, Chukwu, Sancho Nwobuisi , Amadi, Sonny Nwonodi , Ewubare, Dennis Brown

Farmer–Herder Crises and Its Implications on Food Security in Sankera, Benue State, Nigeria: An Empirical Mixed-Methods Study

Author: Iorkaan Samuel Kuma, ., Yange Clement Terlumun, ., Bam Clement Liambee, Hubert, Keghnen Katyona, ., Terngu Paul Ugosor

The Cost of Emotional Labour: Implications for Commercializing Human Resource Outcomes in Modern Organizations

Author: Samuel, Ogonda Victor PhD, Uhuru, Goodluck Prince. PhD, Agara Splendorpeace Dunbo PhD